Skip to content

Highcharts Javascript API

Highcharts Javascript API

Categories

JUMP TO ANOTHER FORUM

1069 results found

  1. i cant find any code snippet for using map-parser

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Add a new useExternal setting to the tooltip config which when set to true, would prohibit the tooltip from actually being shown in the chart, but it would still allow the tooltipRefresh event to fire. By allowing the tooltipRefresh event to still fire, an external non-highcharts tooltip can be created using the information passed along in that event. From looking into the code, this can maybe be done in the Tooltip refresh method?

    [code]
    // update the inner HTML (add the useExternal check here)
    if (text === false || tooltip.useExternal) {
    this.hide();
    } else {

            // show it
            if (tooltip.isHidden)
    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Be able to easily get data from PostGIS, import a KML, or a simple MultiLineString.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. How shall we add patterns and visibility of series in venn diagram? So that can represent the intersected data in patterns and can also disable the unwanted circle through aps by controlling visibility from aps. If you have any kind of solution kindly reply as early as possible.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. The draggable-points module handles logarithmic axes pretty bad, see this fiddle: https://jsfiddle.net/5bkf7pL8/2/

    I did however find an old stackoverflow issue regarding this ( https://stackoverflow.com/questions/18036117/high-charts-draggable-not-working-for-log-scale ) where a solution was found for the old experimental plugin.

    This example ( http://jsfiddle.net/yn1jaL60/ ) shows that dragging is freely permitted, but that there are some bugs with the rendering of the markers, it would seem. So, would be nice to be able to do the actions in fiddle nr 2, with the performance and visuals of fiddle nr 1.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Step line connects data with vertical lines. In order to visualize climatological norm values being able to simply depict a horizontal line for one data point would be handy. Could be realized with a step line chart that hides vertical lines.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Using highchart exporting module, excel is downloaded always with the workbook name ARK1.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Currently, the entire data series is being exported to excel instead of selected custom range by navigator. Image and pdf formats are working fine. Is there any way to export only current plotted series to excel?

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. The general suggestion here is to manage a project using task dependencies and durations rather than dates. The simplest enhancement would be to default a task start date to the end of the dependency task. This is the ASAP assumption. It should then be possible to specify the task duration rather than an end date. Next it would be nice to specify the task start as a duration before or duration after a dependency task end date. There are other assumptions (e.g. as late as possible), but ASAP is the most common. Critical path highlighting would also be useful.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 50 51 52 54 Next →
  • Don't see your idea?